RPD CASSO runs the firm's work the way the Operating Bible describes it: every deliverable moves through its process one step at a time, and nothing is completed, released or billed until the evidence exists. This guide shows each designation what it sees, what it does, and where the system will stop it.

Work belongs to designationsYou act through the designations you hold today. When someone leaves or goes on leave, the work stays where it is; only the holder changes.
Evidence before anything movesA step is done when its evidence is linked. "Available" is not evidence: a stable link to the document is.
Refusals name their ruleWhen the system refuses, the message carries the control that refused it, such as C-03, and says what to do next.
Getting in

Signing in

Everyone

Open casso.rpdca.com and sign in with the email address the firm registered for you and your password. Nobody can create their own account: an administrator adds you and gives you a one-time password.

The RPD CASSO sign-in page with email and password fields
The sign-in page at casso.rpdca.com. Five wrong attempts in a row pause sign-in for that email for fifteen minutes.

Your first sign-in: choose your own password

The first time you sign in with the one-time password, CASSO opens one screen and nothing else. Enter the one-time password, then your new password twice (at least ten characters). From then on only you know it, including the administrator who created your account.

The Choose your own password screen shown at first sign-in
First sign-in. Until a new password is set, every other page stays closed.
  • Changing it later: click your name at the top right, then Change password.
  • Forgotten it: ask the administrator for a new one-time password; CASSO emails it to you. Issuing one signs you out on every device at once.
Getting in

Creating accounts

The master administrator, and anyone holding a designation with people administration: Managing Director, Head of Department, MIS Coordinator

The live system starts with one account, the master administrator, who holds the Managing Director designation. That account creates everyone else. Creating an account happens in two parts: add the person, then give them the designations they hold. Someone with no designation can read the system but cannot act in it.

Add a person

  1. In the left menu, under The Standard, open Designations and people, then the People tab.
  2. Click Add person. Enter the full name and the email address they will sign in with.
  3. Click Add and issue password. CASSO emails the person the sign-in address and a one-time password from notifications@rpdca.com, and shows you the password once in case the email does not arrive (Copy the details then lets you pass them on yourself).
The People tab listing each person with their designations and actions
Designations and people → People. Each person's current designations sit beside their name. New password issues a fresh one-time password; Record leaver ends all their designations and signs them out the same day.
The Add a person dialog with full name and email
Add a person. You never choose someone else's password.
The one-time password dialog showing the sign-in address, email and password
The one-time password, shown once. This picture comes from a practice copy of the system, so the address reads localhost; on the live system it reads https://casso.rpdca.com. Until the person signs in, the People list marks them Awaiting first sign-in.

Give them their designations

  1. Click Assign designation and choose the person.
  2. Choose the designation: for example Team Leader – Tax and Compliance, Senior Assistant or Reviewer.
  3. Choose the practice line if the designation applies to one department only: Municipal Council, Government Tender, Tax and Compliance, Audit and Assurance or Shared Services. Leave it on Firm-wide otherwise.
  4. Choose Holder for the person who does the work, or Standing backup for the named cover. Set the start date and click Assign.
The Assign a designation dialog
Assign a designation. One person can hold several designations. When a designation changes hands, end the old assignment and start a new one; no work item needs to be touched.
Suggested order at go-live. Start with the Heads of Department, Team Leaders, MIS Coordinator and Process Coordinator. Then add the Reviewers and Authorized Approvers, then Senior Assistants, Executives and Article Assistants, and finally the Billing and Recovery Coordinator, the Filing Desk and the Executive Assistant. The MIS Coordinator can then load clients, entities and the Compliance Calendar.
  • Leave or absence: Arrange absence cover gives the standing backup the designation for the dates you set. The work does not move; the backup can simply act on it.
  • A leaver: Record leaver ends every assignment on that date and signs the person out everywhere.
The screens everyone uses

Today: what is yours now

Everyone. It is the first page after sign-in.

Today collects everything waiting on the designations you hold: steps to do, checkpoints to answer or check, completion evidence to verify, reviews and releases waiting for you, defects to clear and Help Tickets. The tiles at the top count them; the lists below open straight into the work.

Every notification (an escalation, an approaching internal date, a Help Ticket that needs you or has come back to you) is also emailed from notifications@rpdca.com to the people who hold that designation, with a link straight to the work.

Today page for a Senior Assistant showing counts and lists
Today, for a Senior Assistant in the Council practice. One step and eight checkpoints are waiting. Notifications holds escalations and messages for your designations.
The amber line at the top says turnaround times are provisional. Every turnaround time is counted in working days, and the firm's working week has not yet been confirmed by the Managing Director (validation point V-13). It disappears once the week is confirmed on the Working Calendar.
The screens everyone uses

A work item, from top to bottom

Everyone who works on a deliverable

Every deliverable (a Council report, a GST return, a tax audit) is one work item with a Work ID such as MC-00009. Its page reads from top to bottom:

  • The chain of processes (MC-01MC-08), with the current one highlighted and its five stages beneath.
  • The date rail: the firm's internal date is set before the statutory or contractual date, and the rail shows how many days remain.
  • Checklist, evidence and Full Kit status, each computed and never typed in.
  • What happens next: the next step, who holds it today, the input it needs, its turnaround time, what counts as evidence and what to do if it is delayed.
  • Who: the maker, checker and approver designations, resolved to today's people.
A Council work item showing the process chain, five stages, date rail and the next step
A Council assignment at MC-04, Council accounting execution. The next step belongs to the Executive, and the Full Kit is at 79%.

The tabs under the panel hold the detail:

TabWhat it is for
StepsEach step of the current process, done in order. A step is recorded done with its evidence link.
ChecklistThe checkpoints for this process, answered Yes, No or N/A by the maker and checked by the checker.
Full KitThe documents the step needs before it may start, with deficiencies chased from the client.
Review and releaseThe independent review, then the signed release (with UDIN where required) and the acknowledgement.
EvidenceCompletion evidence, submitted by the maker and verified by the checker.
BillingThe billable event raised by an acknowledged release.
Queries and ticketsQuestions to the client, and Help Tickets.
Plan, Linked work, ClosureMilestones and capacity, related items, and the nine conditions for full closure.
The screens everyone uses

When the system says no

Everyone

CASSO enforces the Operating Bible's controls in the database, so a refusal cannot be worked around from another screen. Each refusal names its control. These are the ones you will meet most often.

ControlWhat it stopsWhat to do
C-01The same designation acting as maker and checker, or checker and approver, on the same work.Have the checker or approver designation act. The Head of Department can record a segregation exception with a reason.
C-02Completing work whose completion evidence is not yet verified.Submit the evidence link; the checker verifies it.
C-03Completion while a checkpoint is unanswered, or while a Critical or Major checkpoint is answered No.Answer every checkpoint. Correct the defect, answer Yes and have it checked afresh.
C-04Releasing anything outside the firm without a passed review and, where required, a UDIN.Complete the review; the Authorized Approver signs the release.
C-05Working an obligation whose statutory date is not verified, or whose internal date is not before it.Team Leader – Tax and Compliance verifies the Compliance Calendar rule.
C-06Starting a Full Kit step while mandatory documents are missing.Receive the documents, or ask the Head of Department for a written partial-start waiver.
The checklist gate. BLOCKED · checkpoints unanswered is normal while work is under way; it only means completion is not yet possible. BLOCKED · defect open means a Critical or Major checkpoint was answered No, and release is refused as well.
The screens everyone uses

Asking for help: Help Tickets

Everyone. Asking early is the expected thing to do.

When something cannot be cleared where it sits, raise a Help Ticket from the work item (Queries and tickets tab) or from Control → Help Tickets. A ticket needs the Work ID, the blocker, what you already tried, the help you need, the designation that can give it, a decision date and the deadline impact.

Help Tickets register with one valid ticket and one returned incomplete
Help Tickets. A ticket missing any of those details is still saved. It reads INCOMPLETE – returned and goes back to whoever raised it, listing what is missing; nobody can act on it until it is complete. Returned tickets also appear under Today → Help Tickets returned to you.
Role by role

Find your designation

The sections below follow one designation each. Every screenshot comes from a practice copy of the system, filled with fictional clients and people so each screen shows real work; the live system starts empty and fills as the firm uses it.

Role by role

Managing Director

Also the master administrator: creates people and keeps the configuration (see Creating accounts)

The Managing Director sees exceptions and decisions only; routine work never reaches this desk. An empty cockpit is the intended steady state.

The cockpit

Managing Director cockpit with twelve blocks and reserved decisions awaiting
Management information → Managing Director cockpit. Twelve blocks: deadlines at risk, notices classified Material or Reserved, audit qualifications, recovery beyond 90 days, deposits at risk and more. Each figure opens the rows behind it.

Reserved decisions

Only a complete decision pack reaches you: the facts, the options, the exposure, a recommendation and a decision date. Choose an option and record the decision, or return the pack if it is incomplete.

Reserved decisions page with one pack awaiting a decision
Control → Reserved decisions. A bid below the approved floor waits with three options and the Executive Assistant's recommendation.

Confirm the firm's working week

Every turnaround time is counted in working days. Monday to Saturday is proposed but not yet decided. Open Governance → Working Calendar, correct any day, then click Confirm the working week and enter your written confirmation. That closes validation point V-13 and makes turnaround times enforceable. Public holidays and firm holidays are added below the weekly pattern.

Working Calendar with the proposed Monday to Saturday week
Governance → Working Calendar. Only the Managing Director can change or confirm the weekly pattern.
Role by role

Executive Assistant

Prepares what the Managing Director decides

Escalations that climb to Level 4, Reserved notices and reserved matters arrive here as requests. Prepare a decision pack (facts, options, exposure, recommendation, decision date) or return a request as routine. The system refuses a pack for a routine matter and refuses one with missing parts.

Reserved decisions page for the Executive Assistant with a request to prepare
Control → Reserved decisions. A notice classified Reserved is waiting for its pack. The pack is due within 24 hours of classification.
Role by role

Head of Department

Approver on the department's chapters; owns waivers, plans and the escalation ladder

The dashboard

Head of Department dashboard with sixteen blocks
Management information → Head of Department. Sixteen blocks, each naming its owner and the action it asks for. Filter by practice line with the buttons at the top right. "Correct the record first, then read the numbers."

Escalations

A missed internal date climbs the ladder on its own: day 1 to the owner, day 2 to the Team Leader, day 4 to the Head of Department, then weekly to Level 4. Where a statutory or contractual date is at stake, the owner, Team Leader and Head of Department are alerted together the same day.

Escalations page showing the standard ladder and statutory override
Control → Escalations. Nobody has to remember to chase: the clock runs every fifteen minutes.

What only the Head of Department does

  • Full Kit waiver: on the work item's Full Kit tab, approve a written partial start that names exactly which steps may proceed.
  • Plan approval: on the Plan tab. A plan that loads anyone above 100% of capacity is refused.
  • Segregation exception: on the Manage tab, with a reason and a compensating review.
  • Governance: the HCI Tracker (improvement actions), absence testing and CARMA Control, under Governance.
Role by role

Team Leaders

Municipal Council, Government Tender, Tax and Compliance, Audit and Quality

A Team Leader raises the department's work, checks it, keeps every open row with a next action, and is the second rung of the escalation ladder.

The department register

Municipal Council register listing work items with stage, dates, gate and next action
Registers → Municipal Council. One row per deliverable. Raise work opens a new item on an engagement; red, amber and green are calculated, never typed. A row reading No next action is caught by the daily check.

Checking

Checkpoints answered by the makers appear on your Today page to check. You cannot check a checkpoint you answered yourself. A corrected Critical or Major defect must be checked afresh, and never by the person who raised it.

Team Leader – Tax and Compliance: dates and obligations

Statutory dates live in exactly one place, the Compliance Calendar. Each rule carries its official source and the date it was verified. An obligation reads BLOCKED until its rule is verified, and INVALID if its internal date is not before the statutory date.

Compliance Calendar listing rules with statutory dates, sources and verification
Masters → Compliance Calendar. A rule verified more than 90 days ago reads RE-VERIFY.
Obligations register with date gates OK, BLOCKED and INVALID
Masters → Obligations. One row per return, registration and period, generated from the calendar and each entity's applicability.
Role by role

Senior Assistant, Executive, Article Assistant

The people who do the steps

  1. Open the item from Today. The What happens next panel says what the step needs and what counts as done.
  2. If the step is Full Kit gated, receive and index the documents first on the Full Kit tab.
  3. Do the work, then record the step done on the Steps tab with a stable evidence link (a document with a version, not a note that it exists).
  4. Answer your checkpoints on the Checklist tab: Yes with proof, No with a note, or N/A with a one-line reason.
  5. At the end of the process, submit the completion evidence; the checker verifies it and the item moves to the next process.
Steps tab listing the steps of MC-04 with owners, stages and turnaround times
Steps. Each step shows its owner designation, stage, turnaround time and priority. Only the holder of the step's designation can record it.
Full Kit tab with items received, missing and a client deficiency
Full Kit. Each missing item becomes a deficiency with a dated request and follow-ups. A client delay counts as evidenced only when both exist; otherwise the system records it as internal delay.
Checklist tab with checkpoints, severities and the gate
Checklist. Each checkpoint has a severity. A Critical or Major No blocks completion and release; a Minor No is an open point with a named owner and a date, and it must close before archive.
Queries and tickets tab with the query register and Help Tickets
Queries and tickets. Log each query to the client with its date and the officer who must reply. Help Tickets for this item are listed here too.
Role by role

Reviewer

Independent review before anything leaves the firm

Reviews requested by preparers wait in Control → Reviews and releases. Open the work, review against the checklist, and record Pass or Fail; there is no third option. Log every defect you find. You cannot review work you prepared.

Reviews and releases page with one review awaiting a verdict
Control → Reviews and releases. A GSTR-3B waits for its independent review.
Role by role

Authorized Approver

Signs releases and generates the UDIN where the deliverable needs one

A release can be signed only when the review has passed, no review defect is open, the checklist gate is not blocked by a defect, and the approver is neither the preparer nor the reviewer. A report or certificate is refused without its UDIN.

Today page for the Authorized Approver
Today, for the Authorized Approver. Releases waiting for signature appear in their own count.
Review and release tab showing a signed release awaiting acknowledgement
The work item's Review and release tab. After signature, the owner records the acknowledgement (inward number, portal acknowledgement or dated receipt). The acknowledgement is what raises the billable event.
Role by role

Notices and the Filing Desk

The tax team registers proceedings; Senior Assistant – Departmental Filing and Representation runs the desk

A notice is registered on the day it is seen and authenticated on the portal. Its severity is Routine, Material (escalated to the Head of Department) or Reserved (a decision request for the Managing Director). Its internal date always falls strictly before the statutory response date.

Notices register with a Material and a Reserved notice
Registers → Notices. Each notice opens its own work item under TC-05.

The Filing Desk carries out an approved, signed filing and brings back the acknowledgement. Requests are raised from the originating work item, which needs an approved release and a deadline first. The desk records visits, officer interactions and expenses, and never changes what was approved.

Filing Desk with one request and what the desk must not do
Registers → Filing Desk.
Role by role

Billing and Recovery Coordinator

Invoices, receipts, deductions and deposits

A billable event is created by an acknowledged release, never by hand, and the invoice is due within two working days. Record receipts against invoices, split out TDS and other deductions and reconcile them, and chase receivables on the firm's timetable.

Billing and recovery page with billable events, receivables and invoices tabs
Money → Billing and recovery. Billable events waiting for an invoice, Receivables by age, and All invoices.
EMD, bank guarantees and security register with an overdue claim
Money → EMD, BG and security. A deposit without a claim date reads BLOCKED, and one past its claim date reads OVERDUE CLAIM. Unclaimed money is money lost.
Role by role

Process Coordinator

Help Tickets, the daily exception check, System Audit and configuration

The Process Coordinator keeps the registers honest: every open item has an owner, a next action and a date. Help Tickets are resolved or escalated, never left as a queue. The fifteen System Audit tests run against live data every day and can be run on demand.

System Audit with fifteen control tests and their results
Governance → System Audit. A failing test is a control failure, and it lists the items that failed.
Role by role

MIS Coordinator

Masters, obligation generation, the 25 measures and the weekly freeze

Every figure in CASSO traces through the MIS KPI Dictionary to the register rows behind it; nothing is re-keyed. Where a measure has nothing to count, it reads No Data, never zero per cent.

MIS KPI Dictionary with measures, targets and status
Management information → MIS KPI Dictionary. Each measure shows its target, owner and frequency; click it to see the rows it counts.

No dashboard is used in a meeting until its week is frozen. The twelve-step protocol is worked through by its owners, and the MIS Coordinator certifies the week. A frozen week is never changed; reopening it creates a new version with a written reason.

Weekly MIS Freeze twelve-step protocol
Management information → Weekly MIS Freeze.
Reference

Where the rules live

Everyone

Every process the firm runs, all 34 of them, has a chapter under The Standard → Process library. Each chapter covers why the process exists, its five stages, its flowchart, every step with its owner, checker and approver, its checkpoints, and its escalation and closure rules. If you are unsure what a step expects, the chapter answers it.

Process chapter MC-04 Council accounting execution
The Standard → Process library → MC-04. The same text as the Operating Bible, imported and reconciled, never retyped.

Points the firm has still to decide, such as the working week (V-13), sit in The Standard → Validation Register, each with the designation who decides and a deadline.